Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Computer Room Raised Floor Systems Sound Insulation High Strength
HT Super Sound-deadening Calcium Sulphate Raised Floor System with Minimal Propagation of Noise adopts superior high-strength calcium sulphate core. High Pressure Laminate (HPL) covering is sticked to the surface as top surface and galvanized steel steel as base plate. Four edges are sealed by conductive black edge trim. It Combines with round head pedestal and stringer which are moisture-resistant and deformation-resistant.
Application
HT Super Sound-deadening Calcium Sulphate Raised Access Floor with minimal propagation of noise has stable understructure. It is a good choice for some rooms which needs air supply and heating requirements under the floor.
Characteristics
Technical Paramter
Structure Performance | |||
Bearing Load Capacity |
In accordance with PSA |
In accordance with PSA MOB, |
In accordance with PSA MOB, |
Fire Resistance | Class0 & Class1(BS476) A1 noncombustuble(EN13501) | ||
Soundproofing | 28-51 dB(With floor covering) 14-70dB(Without floor covering) |
||
longitudinal sound reduction, footfall sound, improvement in footfall,improvement in impact sound | |||
Environmentfriendly | RoHS certificated, and meet the requirement of LEED evaluation for projects. |
The Advantage of Raised Floor
The use of raised floor in the workplace is rapidly gaining popularity since they present a solution that is specifically designed to support information-rich and highly computerised business environments.
Owners and developers, along with building designers and facility managers, face the challenges of constantly changing space needs, technology-driven operations, high churn rates and the almost impossible task of maintaining flexibility while keeping life-cycle costs down.
All of these challenges demand a new outlook on planning and constructing buildings and some insight into assuring that all building systems are integrated so they become mutually supporting. The costs of both change and maintenance are exceptionally high in traditionally planned buildings, and in many instances users defer needed changes at the cost of organisational comfort and efficiency.
In fact, many traditionally designed facilities become obsolete due to wiring and wiring distribution problems created by organisational changes and advances in technology.
If the building is planned correctly though, with enough thought and creativity, changes can become almost routine and technology can be easily integrated. A well-designed, intelligent building not only has the flexibility and the capacity to accommodate change, it actually promotes change.
CHANGZHOU HT RAISED FLOOR CO.,LTD [China (Mainland)]
Business Type:Manufacturer
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)